Back >>

Wambo

A 3500tph longwall coal clearance system and stockpile system for Wambo’s new underground mine.

 

The design included a cantilevered conveyor over 30,000 tonne stockpile.

 

Extensive re-use of existing conveyor infrastructure including ground structures, drive and gantries. This included the modification of gantries for the cantilevered stockpile