Back >>
Boggabri Coal
GWE has completed the structural and mechanical design of the new stockpile recovery tunnel and load-out conveyor for this new mine.
Bin foundation included an elevated rail wash down and sump facility in the event of coal spillage from a rail wagon.
Works also included design of the fire water and process water systems.