Iron ore, limestone and fluxes, copper and nickel concentrates, quarry products and powders reflect just some of the bulk materials handling projects that GW Engineers have successfully designed, documented and supervised on behalf of our clients. We apply the technology most suited to the application, be it overland conveying, lean or dense phase pneumatic transfer or the pumping of slurries, all of which are technologies that we are thoroughly familiar with. The handling systems inevitably include infrastructure to accommodate storage and surge capacity as well as transfer of materials between discreet systems as part of an integrated process. Our multi-disciplinary engineering team has the knowledge, experience and capability to provide the optimal technical solution while recognising and accommodating the commercial, environmental and safety imperatives essential to any enterprise, thus providing our clients with a holistic solution.

PROJECT | SOUTH GOBI
Achievements
The Ovoot Tolgoi mine’s high quality coking coal was originally excavated with shovels then transferred via front end loaders to 100t capacity trucks.


Click image for further details
PROJECT | GLOUCESTER COAL
Achievements
GW Engineers were commissioned to design and document the mechanical and structural works for the installation of a new Horizontal Belt Filter, a new Jameson Cell and a new de-sliming screen.


Click image for further details
PROJECT | NORTHPARKES
Achievements
The predicted and imminent subsidence due to new underground mine development works necessitated the design and construction of a new conveyor and secondary crusher outside the subsidence zone.


Click image for further details
PROJECT | Hyrock Pty Ltd, Port Kembla NSW
Achievements
Hyrock needed the rapid and cost effective delivery of infrastructure to receive, store and load copper concentrate.


Click image for further details
PROJECT | Liddell Power Station, Hunter Valley NSW
Achievements
Liddell Power Station, Dry Coal Storage project consisting of a 2700m² roof designed for assembly on ground & lifted into final position providing time, cost and OH&S advantages.